GLIAG FLAGSHIP ESSAY | GLIAG-FLAG-2026-1128-KRW-001 | Rev 1.1 | Zoetermeer & Paramaribo, 28 November 2026
State revenue, project economics, transfer pricing and disclosure for Suriname’s first offshore gas development, Block 52 (Sloanea), in three price scenarios anchored on 25 years of gas prices.
Drs. M.P.T. Chin-A-Lien, MBA, M.Sc., Ing. Geologist · Principal Founding Partner and Managing Partner, Golden Lane Investments Advisory Group (GLIAG) · ORCID 0009-0007-1649-602X
Edition of record: DOI 10.5281/zenodo.24627245 · Download the full PDF (21 pages, with all charts) · Licence CC BY-NC-ND 4.0
GLIAG Historical Record · Block 52. Timeline: Block 52 PSC 2013; Sloanea-1 declared commercial 13 November 2025 (Staatsolie); Field Development Plan approved 24 November 2026 and FID 26 November 2026 (Staatsolie FID release). Illustration, not a map of record.
The answer in one paragraph
KrakaWi is likely to pay Suriname billions, but the defensible range is wider than the headlines. GLIAG’s screening model, built only on published FID parameters and labelled assumptions for the undisclosed gas addendum, gives consolidated State receipts of US$2.4bn (P90, US$6.0/MMBtu), US$4.6bn (P50, US$8.5) and US$7.8bn (P10, US$11.5) over 2030-2054, undiscounted and in real 2026 dollars. Staatsolie’s US$7bn needs a realised price near US$10.8/MMBtu FOB under these terms, or a more generous profit-gas share than GLIAG assumes. The swing factor the public has not seen is the related-party chain: the FLNG, the LNG offtake and group financing all sit inside PETRONAS. On GLIAG’s sensitivities, plausible related-party pricing could move about US$0.9bn of value from the State to the PETRONAS group in the base case.
Status of this edition. Revision 1.1 is the public edition of record. It corrects the Rev 1.0 text issued earlier on 28 November 2026 after an independent rebuild of the model: the holiday wording (cap and 2x trigger coincide at P50), the Exhibit 15 labels, the PFLNG DUA depth statement, the IGU 2022 note, the companion-model DOI, and the location line. All changes are listed in Appendix B. The headline numbers are unchanged.
Cite as: Chin-A-Lien, M.P.T. (2026). KrakaWi: What Suriname Will Really Cash. GLIAG Flagship Essay GLIAG-FLAG-2026-1128-KRW-001, Revision 1.1, 28 November 2026. Zenodo. https://doi.org/10.5281/zenodo.24627245
On 26 November 2026 PETRONAS and Staatsolie took the Final Investment Decision on KrakaWi, the Sloanea gas field in Block 52: US$1.6bn, four wells, a floating LNG (FLNG) unit of about 1.5 million tonnes per year, 97 bcm recoverable gas, 25-year life, first gas mid-2030 (Staatsolie, 26 Nov 2026). Within 24 hours three State-revenue numbers were in circulation: “ruim” US$6bn (Staatsolie director Annand Jagesar, as reported by Starnieuws, 26 Nov), US$7bn from official Staatsolie project data (Starnieuws, 27 Nov), and US$8.25bn implied by an earlier GLIAG graphic (US$330m a year times 25). This essay tests all three, adds the transfer-pricing layer that no public figure yet contains, and gives the project’s financial parameters by international standards.
Support the project; do not bank the headline. Plan public finances on the P50 (about US$184m a year on average, US$130-190m a year in 2032-2039, about US$284m a year at plateau after the holiday), treat US$7bn as an upside case, and make publication of the gas addendum, the FLNG charter and the LNG sales terms a condition of parliamentary approval of any further gas fiscal incentive.
Three primary layers exist: Staatsolie’s FID release, PETRONAS’s FID statement, and the project data Staatsolie gave to the press after the announcement. Exhibit 1 brings them together. The Starnieuws data table of 27 November adds the physical parameters that make a volume and transfer-pricing check possible.
| Parameter | Published value | Source | GLIAG check |
|---|---|---|---|
| Investment | US$1.6bn (PETRONAS 80% = US$1.28bn; Staatsolie 20% = US$320m) | Staatsolie FID; Starnieuws 26-27 Nov | Split pro rata; Staatsolie financing reported as secured |
| Recoverable gas | ~97 bcm (3.4 Tcf) | Staatsolie FID; Starnieuws table | 3.4 Tcf = 96.3 bcm: consistent |
| Daily gas production | 270 MMscf/d (~45,000 boe/d) | Starnieuws table | 270 / 6 Mcf per boe = 45,000: consistent |
| FLNG capacity | ~1.5 Mtpa LNG | Staatsolie FID | = ~78 million MMBtu/yr at full rate |
| FLNG unit | 393 m long, 186,000 t, 177,000 m³ LNG, 20,000 m³ condensate | Starnieuws 27 Nov | Matches PFLNG DUA (PETRONAS-owned) [VERIFY: unit not named officially] |
| LNG transport | ~24 cargoes per year | Starnieuws; DBSuriname | 1.5 Mt / 24 = 62,500 t per cargo: consistent |
| Wells, distance, depth | 4 wells; ~120 km offshore; 400-600 m water | Staatsolie; Starnieuws | PFLNG DUA is designed for depths up to 1,500 m and moored in 1,300 m at Rotan; KrakaWi is far shallower [VERIFY: lower design limit not published] |
| Crew | ~120 normal (158 beds) | Starnieuws | n/a |
| Timeline | FDP approved 24 Nov 2026; FID 26 Nov; first gas mid-2030 | Staatsolie FID | n/a |
| Life | 25 years | Staatsolie FID | Production 2030-2054/55 assumed |
| Fiscal | 6.25% royalty; State profit-gas share; tax holiday up to 10 yrs, ends earlier at 2x recovery | Starnieuws 26 Nov; Model PSC 13.1 | Profit-gas % and 2x definition not published |
| State revenue | “Ruim” US$6bn (26 Nov); US$7bn = US$280m/yr avg (27 Nov) | Starnieuws | No price deck, discount rate or annual series |
Sources: Staatsolie FID release; Starnieuws 95051; Starnieuws 95060; DBSuriname; PETRONAS, PFLNG DUA; Riviera, PFLNG Dua.
Two statements in the press record matter for what follows. First, Jagesar explained that the 2013 PSC allows separate fiscal terms for non-associated gas and that terms modelled on oil conditions gave insufficient returns, so new terms were negotiated (Starnieuws, 26 Nov). Second, the same article reports that a new FLNG would cost about US$3.5bn and that the project instead uses an existing unit. Both facts point to the same place: the State’s revenue depends on contract terms and on the price of an asset the operator’s group already owns.
The GLIAG Public Fiscal Disclosure Note (GLIAG-KRW-FISCAL-NOTE-2026-11-27) and the companion State Revenue Comparison (GLIAG-KRW-COMP-2026-11-27) already established the boundary of what can be stated. This chapter consolidates them.
| Figure | Origin | Per year (÷25) | Status |
|---|---|---|---|
| “Ruim” US$6bn | Jagesar, press conference, 26 Nov (Starnieuws) | US$240m | Attributed statement; no method |
| US$7bn | Official Staatsolie project data, 27 Nov (Starnieuws) | US$280m | Latest public headline; no price deck or annual series |
| US$8.25bn | Earlier GLIAG graphic: US$330m x 25 | US$330m | Illustrative; plateau value applied to all years. Withdrawn as a total |
| Gap 6 → 7 | US$40m | +16.7%; unexplained in publication |
The GLIAG disclosure note made three points that remain correct. The public record does not support a verified annual split among PETRONAS, Paradise Oil/Staatsolie and the Government. The US$320m Staatsolie contribution is capital invested, not State income, and the US$1.28bn PETRONAS figure is an 80/20 arithmetic illustration. And any “cash for Suriname” total must consolidate the project entity, Staatsolie/Paradise Oil and central government without double counting dividends that a headline may already include.
GLIAG’s own published screening note, KrakaWi: The Sovereign Cash Horizon (doi:10.5281/zenodo.24587635), modelled US$6.07bn net of Staatsolie’s capex at US$10/MMBtu with a zero State profit-gas share, and identified 2037 as the year receipts double. Its plateau of about US$330m a year is the source of the US$8.25bn misreading: multiplying a plateau year by 25 ignores the seven low years of ramp-up and holiday. The present essay supersedes that note’s single-price case with a three-scenario model and an explicit profit-gas assumption. For reference, the present model at US$10 with a zero profit-gas share gives US$5.1bn; the difference from US$6.07bn lies in the cost and depreciation profile of the earlier note, not in the fiscal logic.
A 25-year total hides timing. In GLIAG’s P50, State receipts run at about US$130m a year in 2032-2035, rise to US$143-188m in 2036-2039 and reach US$284m a year in 2040-2049. Discounted at 6%, the P50 total of US$4.6bn is worth US$1.7bn at 2027; at 10% it is worth US$0.9bn. Budget planning should use the annual path, not the total.
A revenue claim is only as good as the volume under it. Exhibit 3 sets the published recoverable gas against the published production rate.
Exhibit 3. Volume bridge: the published parameters leave about 27 bcm unexplained. Chart available in the PDF edition (DOI 10.5281/zenodo.24627245).
Sources: Staatsolie FID (97 bcm); Starnieuws table (270 MMscf/d); GLIAG model KRW-FLAG-01 (LNG sold at 1.40 Mt/yr plateau, 52 MMBtu/t, 0.0363 MMBtu/m³).
The volume bridge is also the decisive test of the Mungra note (Chapter 11), whose model assumes 5 bcm a year of sales gas, close to twice the published feed-gas rate.
The International Gas Union’s world average wholesale gas price for 2005-2025 (Exhibit 4) is a useful anchor, with two cautions. The IGU states that its world average blends gas-on-gas, oil-indexed and regulated prices; it is not an LNG contract price. And the IGU itself gives two values for the 2022 peak: US$9.45/MMBtu in its headline releases (IGU 2025 release; World Pipelines on the 2026 survey) and US$9.48 in the survey’s 2005-2025 comparison chapter (IGU, 2026 Wholesale Gas Price Survey). GLIAG uses the headline US$9.45. The 2025 value of US$5.31 is confirmed.
Exhibit 4. IGU world average wholesale gas price, survey years 2005-2025. Chart available in the PDF edition (DOI 10.5281/zenodo.24627245).
Source: IGU, 2026 Wholesale Gas Price Survey; redrawn by GLIAG in English from the chart prepared for this essay.
A KrakaWi cargo will be priced against the markets it can reach: Europe (TTF), Asia (JKM or oil-indexed contracts) and, as the competing supply, US Gulf LNG linked to Henry Hub. Exhibit 5 places those benchmarks over 25 years next to the three scenarios used in this essay.
Exhibit 5. Twenty-five years of gas benchmarks (2001-2025) and the three KrakaWi price scenarios. Chart available in the PDF edition (DOI 10.5281/zenodo.24627245).
| Benchmark | Mean | Median | Low decile | High decile | Max (year) |
|---|---|---|---|---|---|
| Henry Hub spot (EIA) | 4.30 | 3.89 | 2.52 | 6.97 | 8.86 (2008) |
| Europe gas, TTF-based (IMF) | 9.30 | 8.21 | 3.49 | 13.14 | 37.52 (2022) |
| Asia LNG (IMF) | 10.97 | 9.38 | 4.67 | 18.15 | 33.30 (2022) |
| IGU world average (18 survey years, 2005-2025) | 4.88 | 4.65 | 3.80 | 5.60 | 9.45 (2022) |
Data: FRED AHHNGSP (EIA); FRED PNGASEUUSDA and FRED PNGASJPUSDA (IMF); IGU values read from the IGU chart, rounded to 0.1. GLIAG calculation; means, medians and maxima re-checked against FRED on 28 Nov 2026. Deciles are rank-based; an interpolated percentile shifts them by up to US$0.3.
History cannot forecast a 2030-2055 price, but it bounds a defensible range. Three observations shape the scenarios. Prices mean-revert after shocks: 2008, 2014 and 2022 were each followed by a fall of more than 50% within two to four years. The 2026 Strait of Hormuz disruption lifted Q2 2026 TTF to near US$16 and Asian spot to US$17.5 (IEA, Gas Market Report Q3-2026), but the IEA also records a wave of new LNG capacity from 2026 into the early 2030s, which is the decade KrakaWi enters. And a FOB Suriname netback sits below European and Asian delivered prices by shipping and regasification costs, which GLIAG puts at US$1.0-1.5/MMBtu to Europe [assumption].
| Scenario | US$/MMBtu FOB | Historical analogue | Probability framing |
|---|---|---|---|
| Low (P90) | 6.0 | Europe/Asia low-decile years (2016, 2019-2020) less shipping; a 2030s LNG glut | 90% chance the realised average is higher |
| Base (P50) | 8.5 | Between Europe (8.2) and Asia (9.4) medians; ~12-13% oil slope at US$70 Brent less shipping | Central case |
| High (P10) | 11.5 | Asia 25-year mean (11.0) held for 25 years; recurring shocks | 10% chance the realised average is higher |
A flat real price is a simplification. A cycle with the same average lowers the State’s present value slightly when high prices arrive during the holiday and raises it when they arrive after 2040. The scenarios are therefore averages, not forecasts of any single year.
GLIAG built model KRW-FLAG-01 along the IMF’s Fiscal Analysis of Resource Industries logic (IMF FARI; Benninger et al., IMF WP/24/89): annual cash flows, the fiscal waterfall applied year by year, discounting at mid-year to 1 January 2027, real 2026 dollars. Every input that Staatsolie or PETRONAS has not published is labelled an assumption in Exhibit 8.
| Input | Value used | Status |
|---|---|---|
| Capex | US$1.6bn: 25% 2027, 45% 2028, 30% 2029 | Total published; phasing assumed |
| LNG sales | 0.35 Mt (2030), 1.20 Mt (2031), 1.40 Mt/yr 2032-2049, -15%/yr 2050-2054; 31.2 Mt total | Assumed (93% utilisation of 1.5 Mtpa) |
| Energy content | 52 MMBtu per tonne LNG | Industry standard |
| Condensate | Excluded (upside) | Storage published, volume not |
| Opex | Field O&M US$55m/yr + FLNG charter and O&M US$110m/yr at plateau (~US$2.25/MMBtu), scaled with throughput, floor 60% | Assumed; FLNG fee is a related-party price |
| Decommissioning | US$160m in 2055 | Assumed (10% of capex) |
| Royalty | 6.25% of gross value | Published (Model PSC 13.1; Starnieuws) |
| Cost-recovery ceiling | 80% of production after royalty | Assumed (blank in Model PSC 14.5) |
| State profit-gas share | 10% if R<1.5; 20% if 1.5≤R<2.5; 30% if R≥2.5 (R-factor per Model PSC 14.7) | Assumed; gas addendum not public |
| Income tax | 36% (Model PSC 19.2.1); capex depreciated over 5 years | Rate published; depreciation assumed |
| Tax holiday | Ends at the earlier of 10 years from first gas or contractor pre-tax operating cash ≥ 2x US$1.6bn | Published in outline; definition assumed |
| State consolidation | Royalty + State profit gas + PETRONAS income tax + Paradise Oil 20% cash net of its capex | GLIAG convention (Paradise Oil tax is intra-State) |
| Discount rates | 10% (investor, industry convention); 6% (State) | Convention |
Model PSC clauses from Staatsolie Model PSC. The Block 52 PSC (2013) and its gas addendum may differ from the current model text [VERIFY].
Exhibit 9 shows the annual path in the base case. Three steps shape it. In 2036-2037 the capex pool is fully recovered, so more production falls into profit gas and the State’s 10% share rises in money terms. In 2039 the R-factor crosses 1.5, which lifts the State’s profit-gas share from 10% to 20%. In 2040 the tax holiday ends.
Exhibit 9. Base case (P50, US$8.5/MMBtu FOB): consolidated State receipts by stream. Chart available in the PDF edition (DOI 10.5281/zenodo.24627245).
Exhibit 10. Cumulative consolidated State receipts: three GLIAG scenarios versus public figures. Chart available in the PDF edition (DOI 10.5281/zenodo.24627245).
| Stream | Low P90 (US$6.0) | Base P50 (US$8.5) | High P10 (US$11.5) |
|---|---|---|---|
| Gross LNG revenue (100%) | 9,723 | 13,774 | 18,636 |
| Royalty 6.25% | 608 | 861 | 1,165 |
| State profit gas | 363 | 1,317 | 2,555 |
| Income tax paid by PETRONAS (80%) | 806 | 1,229 | 2,189 |
| Subtotal: Government receipts | 1,777 | 3,407 | 5,909 |
| Paradise Oil 20% cash, net of US$320m capex and decommissioning share | 621 | 1,190 | 1,854 |
| Consolidated State total, undiscounted | 2,398 | 4,596 | 7,763 |
| Average per year (÷25) | 96 | 184 | 311 |
| Year 2035 (in holiday) | 83 | 131 | 226 |
| Year 2040 (plateau) | 151 | 284 | 418 |
| First income-tax year | 2040 | 2040 | 2037 |
| PV at 6% (1 Jan 2027) | 816 | 1,684 | 3,003 |
| PV at 10% (1 Jan 2027) | 392 | 904 | 1,706 |
GLIAG model KRW-FLAG-01. Paradise Oil cash is shown before financing costs; at an assumed 8% loan rate, interest on its US$320m would total about US$125-307m across the scenarios.
Under GLIAG’s terms, US$6bn requires US$9.8/MMBtu FOB and US$7bn requires US$10.8/MMBtu FOB, flat over 25 years. If the State’s profit-gas share is set to zero, as in GLIAG’s 27 November note, the P50 falls to US$4.0bn. Staatsolie’s US$7bn is therefore consistent with either a price deck near the P10-P50 boundary, or a profit-gas formula more favourable to the State than 10-30%, or a definition of “State revenue” that includes items such as Staatsolie’s tax or dividends gross of financing. Only the gas addendum and Staatsolie’s price deck can tell which.
The parameters below follow standard upstream practice: net present value at 10% (NPV10), internal rate of return (IRR, or rate of return, ROR), payback from 1 January 2027, profitability index (PI = 1 + NPV10 / PV of capex) and undiscounted return on investment (ROI = cumulative net cash flow / capex). Government take is the State’s consolidated share of pre-fiscal project net cash flow.
| Metric | Low P90 | Base P50 | High P10 |
|---|---|---|---|
| Project (100%, pre-fiscal) | |||
| Net cash flow, US$m | 4,075 | 8,126 | 12,988 |
| NPV10, US$m | 263 | 1,422 | 2,813 |
| IRR (ROR) | 12.0% | 19.3% | 26.2% |
| PETRONAS (80%, after tax) | |||
| Net cash flow, US$m | 1,677 | 3,530 | 5,225 |
| NPV10, US$m | -128 | 518 | 1,106 |
| IRR (ROR) | 8.5% | 15.4% | 21.0% |
| Payback from 1 Jan 2027, years | 11.0 | 8.1 | 6.7 |
| Profitability index | 0.88 | 1.47 | 2.00 |
| ROI, undiscounted (x capex) | 1.3x | 2.8x | 4.1x |
| Paradise Oil / Staatsolie (20%, pre-financing) | |||
| NPV10, US$m | 2 | 180 | 387 |
| IRR (ROR) | 10.1% | 16.6% | 22.8% |
| ROI, undiscounted (x US$320m) | 1.9x | 3.7x | 5.8x |
| State (consolidated) | |||
| Government take, undiscounted | 58.8% | 56.6% | 59.8% |
| Government take, NPV10 basis | n.m. | 63.6% | 60.7% |
GLIAG model KRW-FLAG-01. n.m. = not meaningful (project NPV10 near zero). Paradise Oil earns more per dollar than PETRONAS because it pays no net tax on a consolidated basis; on a stand-alone basis its tax would be paid to the State.
The holiday ends at the earlier of ten years or the moment the investor has recovered its investment twice (Starnieuws, 26 Nov). How “recovered” is measured determines the State’s cash between 2030 and 2040. Exhibit 13 shows, for GLIAG’s definition (contractor pre-tax operating cash after royalty and State profit gas), how long the holiday lasts at each price.
Exhibit 13. Tax-holiday length versus price (2x trigger on contractor pre-tax operating cash). Chart available in the PDF edition (DOI 10.5281/zenodo.24627245).
GLIAG model KRW-FLAG-01. Holiday years counted in calendar years from 2030, including the half-year of 2030.
Three conclusions follow. At P50 the two tests coincide: cumulative contractor cash passes 2x (US$3.2bn) in 2039, the last year of the 10-year cap, so income tax starts in 2040 either way. The holiday falls to nine years from about US$8.8/MMBtu, and at P10 tax starts in 2037. Jagesar’s “three to four years at current prices” is reproducible only at about US$20-28/MMBtu FOB, or if the trigger counts gross revenue rather than net cash. Both readings may be correct: 2026 crisis prices are high, and a gross trigger would be favourable to the State. But neither is a planning assumption, and the definition is not public.
Ir. Mungra’s note lists the questions correctly; GLIAG adds the money at stake. Each item can shift the end of the holiday by one to three years, worth about US$95m of income tax per year at the P50 plateau (about US$143m at P10): (1) gross revenue or net cash; (2) nominal or real (inflated) investment; (3) whether financing costs and intra-group interest reduce “recovery”; (4) whether abandonment provisions count as investment; (5) the investor’s 80% or the 100% project; (6) the audit standard for costs inside the test. GLIAG’s sensitivity at P10: deducting US$115m a year of intra-group interest from the trigger extends the holiday by two years and costs the State about US$0.2-0.3bn (US$222m in the primary model, US$286m in the independent rebuild).
Every public estimate so far, including GLIAG’s own, assumes that costs and prices inside Block 52 are set at arm’s length. The OECD defines that principle as the international consensus for valuing transactions between associated enterprises (OECD Transfer Pricing Guidelines 2022). KrakaWi is unusual in how much of its value chain sits inside one group.
| Flow | Counterparty | Why it is related-party | What sets the State’s exposure |
|---|---|---|---|
| FLNG lease, O&M, relocation | PETRONAS group (unit matching PFLNG DUA) | PETRONAS owns and operates PFLNG DUA | Charter rate, life-extension capex, who bears downtime |
| LNG sales | PETRONAS LNG portfolio | PETRONAS states KrakaWi adds supply to its global LNG portfolio | Price formula, index, discount to marker, destination flexibility |
| Shipping | Carrier operators [VERIFY] | PETRONAS has used MISC-operated carriers for PFLNG DUA cargoes | Whether freight is netted from the State’s valuation point |
| Financing | Group treasury | Shareholder loans and guarantees | Interest inside cost recovery and inside the 2x test |
| Overhead, services, insurance | Parent and affiliates | Management fees, technical services, captive insurance | Caps and audit rights |
Sources: PETRONAS FID statement via MENAFN; PETRONAS first cargo from two FLNGs; Starnieuws 27 Nov (FLNG dimensions).
Exhibit 15. What related-party pricing could cost the State (GLIAG sensitivities). Chart available in the PDF edition (DOI 10.5281/zenodo.24627245).
GLIAG model KRW-FLAG-01. The combined bar is the three base-case effects run together (381 + 68 + 436 = 885, plus about 47 from interaction). The intra-group interest case changes nothing at P50, where the 10-year cap and the trigger coincide; it is shown at P10 and is not part of the combined total. The independent rebuild gives -380, -65, -405, a combined -892 and -286 at P10.
The sensitivities in Exhibit 15 are illustrations, not allegations. Together the three base-case effects move US$932m of undiscounted value (US$228m at NPV10) out of the State’s share, while the PETRONAS group gains about US$582m outside the Block 52 ring fence. The asymmetry exists because a cost inflated inside the ring fence is partly paid by the State through lower profit gas and tax, while the margin is earned by an affiliate outside it.
(1) An LNG valuation floor: realised price, but not below a published marker (for example a TTF or JKM netback less agreed freight). (2) Disclosure of the FLNG charter rate and an independent benchmark against third-party FLNG leases. (3) A cap on parent overhead (for example 1-2% of costs, declining with spend). (4) Exclusion of intra-group interest from cost recovery and from the 2x test. (5) Audit window extended from two to five years, with the right to engage international auditors at contractor cost. (6) Use of the Platform for Collaboration on Tax toolkit on comparables for the Ministry of Finance’s transfer-pricing unit.
Ir. Dharmvir K. Mungra circulated a 14-page Voorlopige analyse van de FID voor Blok 52 PETRONAS on 28 November 2026. It is the first independent public-interest review of the KrakaWi terms by a Surinamese engineer and deserves a careful answer. Its governance argument is strong; its numerical model needs correction.
| Item | Mungra note | Published / GLIAG | Effect |
|---|---|---|---|
| Recoverable gas and life | 100 bcm over 20 years | 97 bcm over 25 years | Shorter life inflates annual volume |
| Annual sales energy | 180 million MMBtu (5 bcm) | ~73 million MMBtu (1.40 Mt LNG); feed gas 2.79 bcm at 270 MMscf/d | Revenue overstated ~2.5x |
| Annual project cash at US$8 | US$1.08bn | ~US$420m (GLIAG, before fiscal terms) | Holiday end too early |
| 2x trigger at US$8 | ~3 years | 10-year cap binds at US$8 (GLIAG) | Tax start 2040, not ~2034 |
| State totals | Table: US$0.75 / 2.0 / 4.3bn; Section 10: Staatsolie alone US$2.16 / 4.32 / 7.20bn | GLIAG: US$2.4 / 4.6 / 7.8bn consolidated | Internal inconsistency in the note |
| Staatsolie cash | 20% of project cash, no tax, royalty or profit gas | 20% of contractor cash after royalty and profit gas | Overstates Staatsolie, omits Government streams |
| Government take table | Guyana 50-55%, Norway 75-85%, Qatar 70-85%; no sources | Unsourced; GLIAG cites Guyana terms from EITI and Norway’s 78% from Norwegianpetroleum.no | Use as indicative only |
Source: D.K. Mungra, Voorlopige analyse van de FID voor Blok 52 PETRONAS, 28 Nov 2026 (14 pp., circulated privately); GLIAG model KRW-FLAG-01.
The arithmetic itself is clean; the inputs are the problem. Mungra’s question “why does Jagesar say 3-4 years?” is answered by his own list of explanations: actual production is lower than he assumed. With the published 270 MMscf/d, his method gives a holiday close to the 10-year cap at US$8, as GLIAG finds. His remark that a multi-year cumulative ROI is a poor investment measure is also correct and is why Chapter 8 reports NPV, IRR and PI alongside ROI.
The GLIAG comparison note separated three categories of national value; only the first can be compared with US$6-7bn.
| Category | Content | How to measure |
|---|---|---|
| 1. Direct public cash | Royalty, profit gas, income tax, Paradise Oil distributions | Annual cash series in the national budget (this essay) |
| 2. Wider economic value | Local procurement, jobs (about 120 offshore crew), skills, supply chains | Local-content reporting against contractual targets |
| 3. Option value | Gas-to-Shore, oil from gas-rich reservoirs, later gas phases, the 27 bcm headroom | Separate investment cases; not added to category 1 |
Staatsolie says the infrastructure lays groundwork for producing oil from gas-rich reservoirs, could make further gas developments attractive, and that planning for bringing gas onshore has begun. President Simons stated that the government also wants Gas-to-Shore for industrialisation (Starnieuws 95049). GLIAG’s position, set out to De Nationale Assemblee in Van offshore rijkdom naar veerkrachtige welvaart (doi:10.5281/zenodo.24190651) and in The Onshore Dividend (doi:10.5281/zenodo.24189783), is that the KrakaWi FID package should reserve a domestic gas volume, a riser or subsea tee, and a pipeline corridor now, because each is cheap at FID and expensive after. The Gas-to-Shore Pre-FS is a GLIAG proposal, not a sanctioned project.
Before the announcement GLIAG published what a sound FID package should contain. Sloanea’s FLNG Choice (20 Nov) set a twelve-element Gas-to-Shore test, and The Sloanea Investment Decision (21 Nov) asked readers to score the 26 November announcement on each element as stated, not stated or excluded. The same essay warned that a press conference would not cover all twelve, so a “not stated” calls for checking the Development Plan summary and gas addendum, not a conclusion. Exhibit 17 applies that test to the public record of 26-27 November.
| # | GLIAG pre-FID requirement (20-21 Nov) | What the FID record shows (26-27 Nov) | Score |
|---|---|---|---|
| 1 | Gas balance with a named domestic tranche (50-100 MMscf/d = 0.37-0.73 Tcf over 20 yrs) | 97 bcm recoverable and 270 MMscf/d published; no domestic tranche; ~27 bcm unexplained (Ch. 4) | Partly |
| 2 | Physical tie-in: spare riser slot or subsea export tee | Not stated | Not stated |
| 3 | Sales-gas specification (treatment point, dew point, CO₂, pressure) | Not stated | Not stated |
| 4 | Delivery point and separate fiscal metering for LNG and domestic gas | Not stated | Not stated |
| 5 | Reserved ~120 km pipeline corridor and landfall | Not stated; Staatsolie says planning for bringing gas onshore has begun | Not stated |
| 6 | Phasing with later fields (SAC-1) and third-party access | PETRONAS signals a second gas project at least twice KrakaWi and an oil project; access rules not stated | Partly |
| 7 | Domestic gas obligation in the gas addendum | Not stated; addendum unpublished | Not stated |
| 8 | Transparent domestic pricing formula with floor, cap, review | Not stated; LNG price basis also unpublished | Not stated |
| 9 | Named domestic aggregator with take-or-pay and credit support | LNG goes to PETRONAS’s portfolio; no domestic aggregator named | Partly |
| 10 | Priority and curtailment rules between domestic gas and LNG | Not stated | Not stated |
| 11 | FLNG continuity and mobility (notice, step-in, continued supply) | Existing FLNG reused (dimensions match PFLNG DUA); unit, charter and continuity terms not stated | Partly |
| 12 | Fiscal, financing and disclosure terms | 6.25% royalty; holiday max 10 yrs capped at 2x; Staatsolie financing secured; Gas-to-Shore a government intent; no domestic terms published | Partly |
Sources: GLIAG pre-FID essays above; Staatsolie FID release; Starnieuws 95049, 95051, 95060.
Score: none of twelve fully met, five partly met, seven not stated. The FID secured the export project and its headline fiscal terms. It did not lock in any of the low-cost provisions for domestic gas that are cheapest to reserve before construction: a riser slot or tee, a corridor, a domestic obligation and a pricing rule. Two of GLIAG’s pre-FID engineering points now need an answer. PETRONAS describes PFLNG DUA as designed for reservoirs in water depths up to 1,500 m and moored it at Rotan in 1,300 m (PETRONAS, 2019); the 400-600 m confirmed at FID is far shallower than that design case, so mooring and riser re-engineering is likely [VERIFY: lower design limit not published]. Whether its cost sits inside the US$1.6bn or in the charter rate matters for transfer pricing (Chapter 10). And the 27 bcm volume headroom is the natural home for the domestic tranche GLIAG asked to be named.
GLIAG audited its July 2026 Sloanea prognosis against the FID in KrakaWi at FID: The July Sloanea Prognosis Audited (doi:10.5281/zenodo.24570696). The same discipline applied to others in this essay applies to GLIAG.
| Item | GLIAG July 2026 | FID outcome | Verdict |
|---|---|---|---|
| FID timing; concept; first gas | H2 2026; wells + subsea + FLNG; ~2030 | 26 Nov 2026; 4 wells + subsea + FLNG; mid-2030 | Hit |
| Royalty; equity split | 6.25%; 80/20 | 6.25%; 80/20 | Hit |
| Holiday as bankability tool | Thesis | Confirmed by Jagesar (oil terms insufficient) | Hit |
| Block 52 as gas province; Gas-to-Shore as option | Thesis | Second, larger gas project signalled; Gas-to-Shore not in FID | Hit |
| FLNG capacity | 2.0 Mtpa | ~1.5 Mtpa | Miss |
| Capex | New-build FLNG > US$4.0bn | US$1.6bn total, existing FLNG | Miss |
| Project life | 20 years | 25 years | Miss |
| Tax holiday | 10 years flat | Max 10 years, ends at 2x recovery | Miss |
| State take, life of field | US$0.88-1.58bn (20 yrs) | ~US$6-7bn (Staatsolie); US$2.4-7.8bn (this essay) | Miss |
Source: GLIAG audit of 26 Nov 2026, 23 items: 10 confirmed, 13 revised or corrected (4 revised and 9 corrected in its strict reading).
The lesson GLIAG draws for its own work: the strategic calls (timing, concept, fiscal logic, gas-province thesis) held; the quantitative calls missed where they depended on an asset choice (new-build versus reused FLNG) that was not public. That is the same reason this essay labels every undisclosed input and publishes ranges, not a single number.
Merging the GLIAG notes, Ir. Mungra’s checklist and EITI practice, GLIAG ranks the disclosures by the State revenue they protect.
Reference standard: 2023 EITI Standard, Requirements 2.4 (contracts) and 2.6 (state participation).
KrakaWi is a sound project for Suriname and for PETRONAS. On public data the State should plan on about US$4.6bn over 25 years (P50), with a P90-P10 range of US$2.4-7.8bn, and treat Staatsolie’s US$7bn as an upside case that needs about US$10.8/MMBtu.
Published FID parameters; Model PSC royalty, tax and R-factor structure; 25 years of benchmark prices; a transparent annual fiscal model with labelled assumptions.
Price drives most of the range (US$2.4bn to US$7.8bn between P90 and P10). The undisclosed profit-gas formula is second (US$0.6bn between a 0% and a tiered share at P50). Related-party pricing is third (up to about US$0.9bn at P50). The 2x definition matters most between P50 and P10.
| FACT | FID 26 Nov 2026; US$1.6bn; 97 bcm; 270 MMscf/d; ~1.5 Mtpa existing FLNG; 6.25% royalty; holiday up to 10 years, ending earlier at 2x recovery; Staatsolie 20% via Paradise Oil; State-revenue figures of “ruim” US$6bn (26 Nov) and US$7bn (27 Nov) without a price deck. |
| MISSING | Gas addendum (profit-gas tiers, cost-recovery ceiling, depreciation); the 2x test definition; LNG sales formula and valuation point; FLNG identity and charter rate; Staatsolie price deck and annual series; Paradise Oil financing terms; any domestic-gas provision; the explanation of the 27 bcm headroom. |
| GLIAG JUDGEMENT | GLIAG’s view is that Suriname should plan on the P50 of US$4.6bn (US$1.7bn at 6%), with tax receipts from 2040, treat US$7bn as an upside case, and price the related-party chain as the largest unpriced risk (about US$0.9bn at P50). |
| TRIGGER | Publication of the gas addendum or the 2x definition; an LNG contract above a 13% Brent slope or at JKM parity; an FLNG charter benchmark; a Staatsolie annual series more than 20% from Exhibit 11; a named domestic tranche for the 27 bcm. |
“KrakaWi can deliver Suriname roughly US$2.5-8bn in State receipts over 25 years, with about US$4.5bn as a central estimate at long-run LNG prices; Staatsolie’s US$7bn corresponds to the upper half of that range. Receipts stay modest until the tax holiday ends, most likely around 2040, and will depend on LNG prices, the published gas fiscal terms and arm’s-length pricing of the FLNG and LNG sales.”
| Year | LNG Mt | Gross | Royalty | Opex | Capex/ Abex | State PG | CIT PET | POC cash | State total | PETRONAS |
|---|---|---|---|---|---|---|---|---|---|---|
| 2027 | 0.00 | 0 | 0 | 0 | 400 | 0 | 0 | (80) | (80) | (320) |
| 2028 | 0.00 | 0 | 0 | 0 | 720 | 0 | 0 | (144) | (144) | (576) |
| 2029 | 0.00 | 0 | 0 | 0 | 480 | 0 | 0 | (96) | (96) | (384) |
| 2030 | 0.35 | 155 | 10 | 121 | 0 | 3 | 0 | 4 | 17 | 17 |
| 2031 | 1.20 | 530 | 33 | 149 | 0 | 10 | 0 | 68 | 111 | 270 |
| 2032 | 1.40 | 619 | 39 | 165 | 0 | 12 | 0 | 81 | 131 | 323 |
| 2033 | 1.40 | 619 | 39 | 165 | 0 | 12 | 0 | 81 | 131 | 323 |
| 2034 | 1.40 | 619 | 39 | 165 | 0 | 12 | 0 | 81 | 131 | 323 |
| 2035 | 1.40 | 619 | 39 | 165 | 0 | 12 | 0 | 81 | 131 | 323 |
| 2036 | 1.40 | 619 | 39 | 165 | 0 | 26 | 0 | 78 | 143 | 311 |
| 2037 | 1.40 | 619 | 39 | 165 | 0 | 42 | 0 | 75 | 155 | 299 |
| 2038 | 1.40 | 619 | 39 | 165 | 0 | 42 | 0 | 75 | 155 | 299 |
| 2039 | 1.40 | 619 | 39 | 165 | 0 | 83 | 0 | 66 | 188 | 266 |
| 2040 | 1.40 | 619 | 39 | 165 | 0 | 83 | 96 | 66 | 284 | 170 |
| 2041 | 1.40 | 619 | 39 | 165 | 0 | 83 | 96 | 66 | 284 | 170 |
| 2042 | 1.40 | 619 | 39 | 165 | 0 | 83 | 96 | 66 | 284 | 170 |
| 2043 | 1.40 | 619 | 39 | 165 | 0 | 83 | 96 | 66 | 284 | 170 |
| 2044 | 1.40 | 619 | 39 | 165 | 0 | 83 | 96 | 66 | 284 | 170 |
| 2045 | 1.40 | 619 | 39 | 165 | 0 | 83 | 96 | 66 | 284 | 170 |
| 2046 | 1.40 | 619 | 39 | 165 | 0 | 83 | 96 | 66 | 284 | 170 |
| 2047 | 1.40 | 619 | 39 | 165 | 0 | 83 | 96 | 66 | 284 | 170 |
| 2048 | 1.40 | 619 | 39 | 165 | 0 | 83 | 96 | 66 | 284 | 170 |
| 2049 | 1.40 | 619 | 39 | 165 | 0 | 83 | 96 | 66 | 284 | 170 |
| 2050 | 1.19 | 526 | 33 | 148 | 0 | 69 | 79 | 55 | 236 | 141 |
| 2051 | 1.01 | 447 | 28 | 134 | 0 | 57 | 66 | 46 | 196 | 117 |
| 2052 | 0.86 | 380 | 24 | 123 | 0 | 47 | 54 | 37 | 162 | 96 |
| 2053 | 0.73 | 323 | 20 | 121 | 0 | 36 | 42 | 29 | 128 | 74 |
| 2054 | 0.62 | 275 | 17 | 121 | 0 | 27 | 31 | 22 | 98 | 56 |
| 2055 | 0.00 | 0 | 0 | 0 | 160 | 0 | 0 | (32) | (32) | (128) |
| Total | 31.2 | 13,774 | 861 | 3,888 | 1,760 | 1,318 | 1,229 | 1,190 | 4,597 | 3,530 |
US$ million, real 2026. PG = profit gas; CIT PET = income tax paid by PETRONAS; POC = Paradise Oil Company (20%), pre-financing. Rounded; totals may differ by 1-2 from Exhibit 11.
All model results in this essay were recomputed by a separate script from the same inputs and compared with every figure quoted in the text and exhibits. The P50 reproduces exactly (State US$4,597m; PV6 US$1,684m; project IRR 19.3%; PETRONAS IRR 15.4%; government take 56.6%), as do the US$6bn and US$7bn breakevens (US$9.84 and US$10.79) and the zero-profit-gas P50 (US$3.97bn). P90 and P10 reproduce within about 2% (US$2.46bn and US$7.83bn). The check also re-read the sources behind each published parameter.
| # | Item | Rev 1.1 change |
|---|---|---|
| 1 | Tax-holiday wording (Finding 3, Ch. 9, Exhibit 9) | “The 10-year cap binds at P50” replaced: at US$8.5 the 2x trigger is met in 2039 (cumulative US$3.44bn against US$3.2bn), the year the cap expires, so tax starts in 2040 on either test. The holiday shortens to nine years from about US$8.8. Jagesar’s 3-4 years needs about US$20-28. |
| 2 | Exhibit 9 and Chapter 7 | Added that the 2036-2037 step comes from the end of capex cost recovery; the 2039 step is the R-factor; chart redrawn with corrected labels. “US$155-188m in 2037-2039” widened to “US$143-188m in 2036-2039”. |
| 3 | Exhibit 15 | Bar “Combined (all four)” relabelled: the US$932m combines the three base-case effects (381 + 68 + 436, plus interaction). The intra-group interest case has no effect at P50 and is shown separately at P10. Chart redrawn. |
| 4 | Intra-group interest at P10 | Independent rebuild gives US$286m against US$222m; the text now gives a range of US$0.2-0.3bn. |
| 5 | PFLNG DUA water depth (Exhibit 1, Ch. 13) | “500-1,500 m turret envelope” not supported by the sources. PETRONAS gives “up to 1,500 m” and a 1,300 m mooring at Rotan; lower limit not published [VERIFY]. |
| 6 | IGU 2022 value (Ch. 5, Exhibit 4) | The 2026 survey itself gives US$9.45 (headline) and US$9.48 (comparison chapter); the chart is not wrong, and GLIAG uses 9.45. Exhibit 4 redrawn in English; wording that described the chart’s origin corrected. |
| 7 | Norway 78% (Ch. 8) | Verified: 22% company tax plus 56% effective special tax (71.8% formal) (Norwegianpetroleum.no). [VERIFY] removed. |
| 8 | Exhibit 6 statistics | Means, medians and maxima re-checked against FRED; deciles noted as rank-based. |
| 9 | Volume headroom (Ch. 4) | Added reconciliation with the “about 1.5 Tcf” in the 26 November essay (LNG-equivalent basis); the feed-gas basis of 27 bcm supersedes it. |
| 10 | References | doi:10.5281/zenodo.24570696 is “KrakaWi at FID: The July Sloanea Prognosis Audited”, not a companion screening model; moved to that entry. Web links added for GLIAG titles. |
| 11 | Exhibit 18 source line | “10 confirmed and 14 revised or corrected” corrected to 23 items: 10 confirmed, 13 revised or corrected. |
| 12 | Front and back matter | Location “Zoetermeer & Paramaribo”; DOI, ORCID, web edition and suggested citation added; FACT · MISSING · GLIAG JUDGEMENT · TRIGGER table (Exhibit 19); About the author and GLIAG; CC BY-NC-ND 4.0 licence; AI disclosure. Layout rebuilt without blank pages. |
Kept as flagged: the FLNG identity (dimensions match PFLNG DUA, but neither company has named the unit) [VERIFY]; the Block 52 PSC terms, for which the current Model PSC is used as proxy for the 2013 contract [VERIFY].
Drs. Marcel P.T. Chin-A-Lien, MBA, M.Sc., Ing., geologist, is Principal Founding Partner and Managing Partner of GLIAG. AAPG Certified Petroleum Geologist Nr. 5201-1996; EFG Chartered European Geologist Nr. 92-1996; AIEN Energy Negotiator (June 2021). He works from Zoetermeer and Paramaribo on the petroleum systems, fiscal design and development strategy of the Guyana-Suriname Basin, and designed the GLIAG GSB Intelligence Platform (GIP). ORCID 0009-0007-1649-602X.
GLIAG (Golden Lane Investments Advisory Group) is an independent petroleum, energy and strategic-advisory platform focused on Suriname, Guyana and the wider Caribbean-South American region. It acts as Owner’s Engineer, project-management consultant and strategic adviser to governments, national oil companies, development-finance institutions and investors, and develops GIP. www.gliag.com · petroleumenergyinsights.com · info@gliag.com
1. No advice. This essay is an independent analytical publication. It is not investment, legal, tax, accounting or financial advice and must not be relied upon as such.
2. No offer or solicitation. Nothing in this document constitutes an offer, invitation or solicitation to buy, sell or subscribe for any security, interest or asset.
3. Independence of analysis. GLIAG has no commercial relationship with PETRONAS, Staatsolie or Paradise Oil Company in respect of Block 52. This essay was not commissioned or reviewed by PETRONAS, Staatsolie, Paradise Oil Company or the Government of Suriname. The author leads GLIAG, which proposes the Gas-to-Shore and New Refinery studies referred to; these are proposals, not sanctioned projects. The model results are GLIAG’s illustrative calculations from public data and labelled assumptions, not verified project data.
4. Forward-looking statements. Statements about prices, production, revenues and fiscal outcomes are forward-looking, subject to material uncertainty, and may differ substantially from actual results.
AI disclosure. Perplexity Computer, an AI agent system, assisted with source verification, an independent rebuild of the screening model, editing, figure preparation and document preparation under the author’s direction. It is not an author; the author is responsible for the content.
Licence and rights. © 2026 Marcel P.T. Chin-A-Lien and GLIAG Intelligence B.V. Licensed under CC BY-NC-ND 4.0 (creativecommons.org/licenses/by-nc-nd/4.0). Golden Lane™, GLIAGOGRAPH™, Sovereign Molecule™, Sovereign Conversion Capacity™ and Caribbean Gas Arc™ are designations of GLIAG. Third-party material quoted or linked remains the property of its owners. Pursuant to Article 4(3) of Directive (EU) 2019/790, the rights holders expressly reserve the use of this work for text and data mining, including the training of artificial-intelligence and machine-learning systems.
GLIAG · Born in knowledge. Built for decisions.
Converting bare headlines into deep strategic, added value · GLIAG · Where Information Becomes Intelligence
Marcel Chin-A-Lien | Zoetermeer & Paramaribo, 28 November 2026
GLIAG-FLAG-2026-1128-KRW-001 · Rev 1.1 · doi.org/10.5281/zenodo.24627245
Under the capped tax holiday, Suriname's annual receipts from KrakaWi step from about USD 164…
KrakaWi (Sloanea, Block 52) at FID: GLIAG audits its 2 July 2026 prognosis against the…
An audit of GLIAG’s 2 July 2026 Sloanea screening model against the 26 November KrakaWi…
PetroChina's record nine-month 2026 cash flow makes a shallow-water Suriname well readily fundable, and its…
The President's Office has invited the media to a Block 52 meeting with PETRONAS on…
Could PETRONAS move PFLNG DUA from Rotan to Sloanea, Block 52 offshore Suriname? A credible…