Version of record: doi.org/10.5281/zenodo.24419050 (Zenodo) · Document ID GLIAG-SI-2026-1121-SLO-FID-01 · Revision 1.0 · 21 November 2026 · Zoetermeer & Paramaribo
Author: Drs. Marcel P.T. Chin-A-Lien, MBA, M.Sc., Ing., geologist · ORCID 0009-0007-1649-602X
Download: English PDF · Nederlandse PDF
Companion: Sloanea’s FLNG Choice (10.5281/zenodo.24407620) · CC BY-NC-ND 4.0 · TDM reserved, Art. 4(3) Directive (EU) 2019/790

Status of this edition. Revision 1.0 is the public edition of the GLIAG strategic-intelligence note of 21 November 2026, written in Dutch and published here in English with an amended Dutch companion edition. The original analysis is kept. It is amended only where the re-checked sources required it, and two sections are new: the evidence table (Section 5) and the Gas-to-Shore announcement test (Section 6). Every change is listed in Annex A. At the source check on 21 November 2026, PETRONAS, Staatsolie and the Office of the President had not announced an FID for Sloanea.

1. What the sources say about 26 November

Thursday 26 November 2026 at 11:30 Suriname time (14:30 UTC; 22:30 in Kuala Lumpur) is, in GLIAG’s reading, the best-supported date for a possible announcement of the final investment decision (FID) for the Sloanea gas field in Block 52. Starnieuws places the meeting at the Presidential Palace and reports that a press conference follows. At the public source check on 21 November, GLIAG found no statement in which PETRONAS, Staatsolie or the Office of the President says that the FID will be announced that day. [1] [5] [6] [11]

2. The sources behind the two dates

Starnieuws reported on 21 November that the Office of the President had officially invited the media to a meeting on important developments in Block 52. The paper says it received confirmation that Tengku Muhammad Taufik, President and Group CEO of PETRONAS, will attend in person, and that the meeting is being prepared in the same format as the October 2024 ceremony at which TotalEnergies and APA announced the GranMorgu FID. According to the paper, the invitation does not state which decisions or agreements will be announced. GLIAG could not inspect the invitation itself. The CEO’s expected attendance and the GranMorgu parallel raise the expectation of a major announcement; the agenda and the content of any decision depend on official publication. [1]

The earlier date, 25 November (Independence Day, the 51st anniversary), came from an assessment by oil and gas expert Roy Shyamnarain in a Radio ABC interview, reported by ABC Suriname and Suriname Herald on 20 November. He stressed that it was his own estimate. He did not rule out that PETRONAS had already taken the decision and was waiting for a suitable moment to announce it, and he expected an existing FLNG vessel to be adapted rather than a new one built. He cited PETRONAS contracts with SLB OneSubsea, Subsea 7, Valaris and Halliburton as signs of preparation. These are attributed expert views, not company statements. The specific date and time of the presidential meeting rest on the later Starnieuws report. [1] [2] [12]

3. What the partners have officially published

On 4 March 2024 Staatsolie, PETRONAS and ExxonMobil signed a Letter of Agreement as the basis for a gas addendum to the April 2013 Block 52 production sharing contract (PSC). It records, with government approval, a tax-free period of ten years from the start of production; Staatsolie then put first gas at 2031 at the earliest. Staatsolie approved the delineation of the commercial field on 11 November 2025 and announced it on 13 November. PETRONAS published the declaration of commerciality on 14 November. Staatsolie set out the next steps as a Development Plan submitted for Staatsolie’s approval, followed by the partners’ FID, then planned for the second half of 2026. [3] [4] [13]

Staatsolie’s Annual Report 2025 anticipates the FID by the end of 2026 with first gas in 2030, and says Staatsolie is framing a financing strategy for its participating interest. On 30 June 2026 PETRONAS targeted the FID “by the end of this year”. At the meeting with President Jennifer Simons on 17 September 2026, Staatsolie Managing Director Annand Jagesar said that important developments were coming soon and that some steps were still needed before FID. The published target for first gas remains around 2030. [5] [6] [11]

4. What an announcement means for Suriname

The Malaysian and international check

The Edge Malaysia reported the declaration of commerciality from the company statement on 14 November 2025. Bernama distributed PETRONAS’s Block 52 update of 30 June 2026. Reuters reported Staatsolie’s oil outlook for the block on 27 May 2026 and treated Sloanea as a separate gas project, with FID expected later in 2026. Upstream reported the commerciality declaration and the FID window then expected; GLIAG could re-read only its headline, as the full article is behind a paywall. Reports that repeat the same company release count as one underlying source. None of the publications consulted independently confirms 25 or 26 November as an FID date. The New Straits Times could not be checked directly. [5] [7] [8] [9] [10]

From approval to execution

Approval of the Development Plan fixes which design basis for execution has been accepted. The formal investment sanction records that the project partners decide to execute. A press release can report both steps together and can appear after the decision has been taken internally. For the GIP timeline each step therefore needs its own source and date. If a release mentions only approval of the plan, the FID status stays open. [1] [3] [4]

The public development concept comprises gas development wells, subsea infrastructure and a floating liquefied natural gas (FLNG) facility. PETRONAS operates Block 52 with 80%; Paradise Oil Company, a Staatsolie subsidiary, holds 20%. Vessel choice, project capacity, capital expenditure, LNG offtake and the terms of any domestic gas supply each need their own confirmation. GLIAG’s screening of 20 November found reuse of PETRONAS’s PFLNG DUA a credible hypothesis, not an announced decision; Sloanea lies in about 450 m of water, outside the published turret design ranges of both DUA (500–1,500 m) and PFLNG SATU (70–200 m). An announced FID would mark the step to execution. The economic value for Suriname then depends on the contracts, the financing and the volumes delivered. [3] [4] [11] [14]

Figure 1. Published Sloanea milestones and pending steps. GLIAG compilation from [3] [5] [6] [11] [13] and [1].

5. Evidence status as at 21 November 2026

FACTMedia invitation from the Office of the President for 26 November, 11:30, with press conference (reported by Starnieuws). Commercial field approved 11 November 2025; declaration of commerciality 14 November 2025. FID targeted by end-2026; first gas around 2030. PETRONAS 80%, Paradise Oil Company 20%. Concept: subsea wells and FLNG. Letter of Agreement of March 2024 with a ten-year tax-free period from start of production. [1] [3] [4] [5] [6] [11] [13]
MISSINGThe invitation text; the date of Development Plan approval; any partner statement of FID; the FLNG vessel; capacity in MTPA; capex; LNG buyers; the gas addendum text; domestic gas terms; Staatsolie’s financing of its 20%.
GLIAG JUDGEMENTGLIAG’s view is that 26 November is the next verification point and that an FID announcement that day is plausible but unconfirmed. An FID would bind the partners to an FLNG export project. It would not by itself secure gas for use in Suriname.
TRIGGERA dated PETRONAS or Staatsolie statement that names Sloanea and the formal investment sanction leads to Revision 1.1 of this note and an update of the GIP Block 52 timeline. A release that names only Development Plan approval leaves the FID open. A named vessel triggers an update of the FLNG screening. [14]

6. Reading the announcement: the Gas-to-Shore test

GLIAG’s paper of 20 November lists twelve elements the Sloanea FID package should contain to keep a Gas-to-Shore option viable. The Gas-to-Shore Pre-Feasibility Study is a GLIAG proposal, not a project approved by the Government of Suriname or Staatsolie. On 26 November each element can be recorded as stated, not stated or excluded. A press conference will probably not cover all twelve; a “not stated” is a question for the published Development Plan summary and gas addendum, not a conclusion. [14]

#FID elementWhat to look for on 26 November
1Gas balance with a domestic trancheRecoverable gas for Sloanea and SAC-1, LNG feed and any named domestic volume in MMscf/d. Illustration: 50–100 MMscf/d for 20 years needs about 0.37–0.73 Tcf (GLIAG calculation).
2Physical tie-in provisionsA spare riser slot or a subsea export tee sized for a domestic stream.
3Sales-gas specificationWhere domestic gas would be treated, and to which dew point, CO₂ and delivery pressure.
4Delivery point and meteringCustody-transfer point and separate fiscal metering of LNG and domestic gas.
5Pipeline corridor and landing pointA reserved seabed corridor for a line of about 120 km and a candidate landfall.
6Phasing with later fieldsWhether SAC-1 is in the first phase and whether third-party gas has access.
7Domestic gas obligationVolume, duration and priority in the gas addendum. Model PSC Article 20 covers crude oil only.
8Pricing formulaA transparent netback or cost-plus price with floor, cap and review dates.
9Offtaker and credit supportA named aggregator, such as Staatsolie or a subsidiary, with take-or-pay terms and creditworthy anchor buyers.
10Priority and curtailment rulesSupply order in a shortfall between the domestic tranche and LNG cargoes.
11FLNG continuity and mobilityFor a chartered or relocated vessel: notice period, step-in and continued domestic supply.
12Fiscal, financing and disclosureWhether the ten-year tax-free period covers domestic sales, a midstream financing path and a published summary of the domestic terms.

7. GLIAG judgement

Follow the press conference of 26 November as the next verification point. The decisive source is a dated statement from PETRONAS or Staatsolie that explicitly names the project and the formal investment sanction. Record both the effective date of the decision and the date of announcement where possible. After that, track vessel choice, contract awards, domestic gas rights and first gas as separate milestones, and test the announcement against the twelve elements in Section 6. GLIAG will issue Revision 1.1 when the partners publish. [1] [3] [5] [14]

References

Evidence as at 21 November 2026, Paramaribo. GLIAG weighted statements by the project partners and the government above media reports for formal milestones. Reports repeating the same company release are one underlying source. Interview statements are attributed to the speaker.

  1. Starnieuws, “Petronas-CEO naar Suriname: investeringsbesluit Sloanea-gasveld Blok 52 in zicht”, 21 November 2026.Meeting, time, press conference and expected attendance of the CEO.
  2. Suriname Herald, “Petronas mogelijk rond Onafhankelijkheidsdag met investeringsbesluit voor gasproject Blok 52”, 20 November 2026.Roy Shyamnarain's assessment in a Radio ABC interview.
  3. Staatsolie, “Staatsolie approves Commercial Field for Sloanea-1 Gas Discovery in Block 52”, 13 November 2025.Approval of the field delineation on 11 November 2025 and the published sequence towards FID (H2 2026).
  4. PETRONAS, “PETRONAS and Staatsolie Declare Commerciality for Sloanea Field”, 14 November 2025.Declaration of commerciality, partners and participating interests.
  5. PETRONAS, “PETRONAS Records Three New Successes in Suriname’s Block 52”, 30 June 2026.FID targeted by end-2026; combined recoverable resources of more than 1 billion boe for the reported successes.
  6. Office of the President of Suriname, “Staatsolie bespreekt uitbreiding elektriciteitsvoorziening en offshore-ontwikkelingen met president”, 17 September 2026.Remaining steps towards FID and the target of first gas around 2030.
  7. The Edge Malaysia, “Petronas, local partner declare Suriname’s gas project commercially viable”, 14 November 2025.Malaysian reporting on the declaration of commerciality.
  8. Bernama, “PETRONAS Records Three New Successes in Suriname’s Block 52”, 30 June 2026.Distribution of PETRONAS's Block 52 update.
  9. Reuters, “Suriname’s Block 52 could become commercial for oil in 18 months, Staatsolie says”, 27 May 2026.Oil outlook for Block 52 and the separate gas development.
  10. Upstream, “Suriname declares commerciality of Petronas’ Sloanea-1 gas discovery”, November 2025.Commerciality and the FID window then expected. Paywalled; headline re-read only.
  11. Staatsolie, Annual Report 2025, 2026.FID anticipated by end-2026, first gas in 2030, Gas Master Plan and financing strategy for the participating interest (pp. 10, 17, 23, 40).
  12. ABC Suriname, “FID Petronas mogelijk rond Srefidensi over gasontwikkeling Blok 52”, 20 November 2026.Original broadcaster's report of the Shyamnarain interview.
  13. Staatsolie, “Staatsolie and offshore partners from Block 52 sign Letter of Agreement”, 4 March 2024.Basis for the gas addendum; ten-year tax-free period from start of production; first gas 2031 at the earliest (2024 view).
  14. Chin-A-Lien, M.P.T. (GLIAG), Sloanea’s FLNG Choice: PFLNG DUA reuse, alternatives, project economics, the Malaysian–Surinamese legal comparison and what the FID must contain for a viable Gas-to-Shore. GLIAG-FE-2026-1120-SLN-001, Revision 1.0, 20 November 2026.GLIAG companion paper: FLNG screening and the twelve FID elements for Gas-to-Shore. Web edition: petroleumenergyinsights.com/sloaneas-flng-choice-gas-to-shore-fid/

Annex A. Amendment register (Dutch note of 21 November 2026 to Revision 1.0)

#LocationOriginal text or gapAmendment and basis
A1Title block, back matterNo author block, DOI, licence or legal notices.Added per GLIAG publication protocol: author and titulatuur, document ID, DOI, web edition, licence, About the author, About GLIAG, disclaimer, AI disclosure, TDM opt-out.
A2EditionDutch only.English version of record added for external publication; Dutch edition retained as amended companion.
A3§1Time in Suriname only; date judgement not labelled.Added UTC and Kuala Lumpur times; “best-supported date” marked as GLIAG’s reading.
A4§2GranMorgu parallel without date; Shyamnarain summarised as “a possible moment”.Added October 2024 GranMorgu ceremony, his view that the decision may already be taken, an adapted existing vessel and the four named contractors, all attributed; added original ABC Suriname source.
A5§3Sequence started at November 2025; H2 2026 plan not stated.Added the March 2024 Letter of Agreement and ten-year tax-free period, the 13 November announcement date, the H2 2026 plan, the financing strategy and the 17 September quote.
A6§4Upstream content cited as read.Marked as paywalled; headline re-read only. Same-release rule moved into this paragraph.
A7§4No link to GLIAG’s own Sloanea research.Added the 20 November FLNG screening result: DUA a credible hypothesis; Sloanea at about 450 m outside DUA and SATU turret ranges.
A8New §5, Figure 1No evidence structure.Added FACT · MISSING · GLIAG JUDGEMENT · TRIGGER table and milestone figure.
A9New §6No test of the announcement’s content.Added the twelve-element Gas-to-Shore test from GLIAG-FE-2026-1120-SLN-001; Gas-to-Shore labelled a GLIAG proposal.
A10ReferencesNames and dates only.Full titles and URLs; [12]–[14] added; Annual Report page numbers added.
A11WitnessNo Witness paragraph.Not supplied and not invented; left for the author.

Method and limitation

Public-source check as at 21 November 2026. The note separates official partner and government statements, media reports and attributed expert opinion. GLIAG did not see the media invitation, the Development Plan, the gas addendum or any LNG sales contract. The 0.37–0.73 Tcf figure in Section 6 is an illustrative GLIAG calculation, not reserves or resources certification.

Suggested citation

Chin-A-Lien, M.P.T. (2026). The Sloanea Investment Decision: What the sources say about 26 November 2026, and how to read the announcement. GLIAG-SI-2026-1121-SLO-FID-01, Revision 1.0, 21 November 2026. GLIAG, Zoetermeer & Paramaribo. Zenodo. https://doi.org/10.5281/zenodo.24419050

About the author

Drs. Marcel P.T. Chin-A-Lien, MBA, M.Sc., Ing., geologist, is Principal Founding Partner and Chief Architect of GLIAG. AAPG Certified Petroleum Geologist #5201-1996; EFG European Geologist #92-1996; AIEN Energy Negotiator. He works from Zoetermeer and Paramaribo on the petroleum systems, fiscal design and development strategy of the Guyana–Suriname Basin, and designed the GLIAG Intelligence Platform (GIP). ORCID 0009-0007-1649-602X.

About GLIAG

GLIAG (Golden Lane Investments Advisory Group) is an independent petroleum, energy and strategic-advisory platform focused on Suriname, Guyana and the wider Caribbean–South American region. It acts as Owner’s Engineer, project-management consultant and strategic adviser to governments, national oil companies, development-finance institutions and investors, and develops GIP. www.gliag.com · petroleumenergyinsights.com · info@gliag.com

Competing interests

The author leads GLIAG, which has authored the Gas-to-Shore Pre-Feasibility Study proposal referred to in Section 6. That study is a GLIAG proposal, not an approved project of the Government of Suriname or Staatsolie. This note was not commissioned or reviewed by PETRONAS, Staatsolie, Paradise Oil Company or the Government of Suriname. GLIAG is not a sponsor of, or equity investor in, any project or licence discussed.

Disclaimer and legal notice

  1. No advice. This note is analysis, not investment, legal, tax or accounting advice. Readers should take their own professional advice.
  2. No offer or solicitation. Nothing in this note is an offer to sell or a solicitation of an offer to buy any security.
  3. Independence of analysis. GLIAG prepared this analysis independently. It is not commissioned, reviewed or endorsed by PETRONAS, Staatsolie, Paradise Oil Company, the Government of Suriname or any institution or publication named or linked.
  4. Forward-looking statements. Statements on FID timing, vessel selection, gas volumes, gas allocation and first gas depend on decisions not yet published. Actual outcomes may differ materially.

AI disclosure. Perplexity Computer, an AI agent system, assisted with source verification, translation, editing and document preparation under the author’s direction. It is not an author; the author is responsible for the content.

Licence and rights. © 2026 Marcel P.T. Chin-A-Lien and GLIAG Intelligence B.V. Licensed under CC BY-NC-ND 4.0. Third-party material quoted or linked remains the property of its owners. The rights holders expressly reserve the rights of reproduction and extraction for text and data mining under Article 4(3) of Directive (EU) 2019/790.

GLIAG · Born in knowledge. Built for decisions.
Insights. Viable Solutions. Resilient Value.
Zoetermeer & Paramaribo · 21 November 2026

Soso Lobi

Marcel

Recent Posts