FLNG Cost Block 52
⸻
Estimated FLNG CAPEX per Design Size
| FLNG Size (MTPA) | CAPEX Estimate (USD) | Cost per Tonne (USD/MTPA) | Notes |
| 1.3 MTPA | $1.3 – $1.7 billion | $1,000 – $1,300 | Based on Tango FLNG & newer small-scale builds |
| 2.4 MTPA | $2.5 – $3.2 billion | ~$1,050 – $1,330 | Mid-size, often modular; Chinese shipyards competitive |
| 3.6 MTPA | $4.0 – $6.0 billion | ~$1,100 – $1,600 | Full-scale, like Coral South FLNG, Prelude FLNG was higher due to complexity |
Key Cost Drivers
FLNG project costs scale significantly with size and complexity.
This is my estimated CAPEX (Capital Expenditure) range, and related Block 52, Petronas, FID expected in 2026.
For new-build FLNG facilities of 1.3, 2.4, and 3.6 MTPA, based on industry benchmarks and recent project data (e.g., Coral South, Prelude, Tango FLNG, and recent Chinese builds).
This essay by Drs. Marcel P.T. Chin-A-Lien explores the distinct meanings of "ring-fencing" in Suriname’s…
ExxonMobil's move into the TTUD-1 area highlights the significance of the Columbus Basin within the…
Suriname's emerging offshore petroleum potential presents a crucial challenge: transforming multi-hub developments into sovereign capabilities…
The essay discusses the evolution of the Guyana–Suriname Basin's petroleum industry, highlighting the transition from…
The Accessible Barrel Doctrine Why Reported Inventory Is Not the Same as Strategic Availability: Lessons…
The second chapter of "Memoirs of the First Curaçao Petroleum Geologist" recounts a transformative journey…