FLNG Cost Block 52
⸻
Estimated FLNG CAPEX per Design Size
| FLNG Size (MTPA) | CAPEX Estimate (USD) | Cost per Tonne (USD/MTPA) | Notes |
| 1.3 MTPA | $1.3 – $1.7 billion | $1,000 – $1,300 | Based on Tango FLNG & newer small-scale builds |
| 2.4 MTPA | $2.5 – $3.2 billion | ~$1,050 – $1,330 | Mid-size, often modular; Chinese shipyards competitive |
| 3.6 MTPA | $4.0 – $6.0 billion | ~$1,100 – $1,600 | Full-scale, like Coral South FLNG, Prelude FLNG was higher due to complexity |
Key Cost Drivers
FLNG project costs scale significantly with size and complexity.
This is my estimated CAPEX (Capital Expenditure) range, and related Block 52, Petronas, FID expected in 2026.
For new-build FLNG facilities of 1.3, 2.4, and 3.6 MTPA, based on industry benchmarks and recent project data (e.g., Coral South, Prelude, Tango FLNG, and recent Chinese builds).
Alonso de Ojeda tells his voyage of 1499 in the first person, day by day,…
Alonso de Ojeda cuenta en primera persona su viaje de 1499, día a día, desde…
Christopher Columbus tells his first voyage of 1492 in the first person, day by day…
Cristóbal Colón cuenta en primera persona su primer viaje de 1492, día a día según…
The essay examines the significance of the West Tapir-1 well in Suriname's offshore exploration history,…
This paper by Drs. M.P.T. Chin-A-Lien proposes that mass-transport events along the Suriname slope induce…